IPP Coal
The Coal Baseload IPP Procurement Programme has been designed to procure capacity and energy derived from 2 500 (two thousand five hundred) megawatts of coalfired power generation. The new generation capacity to be provided in the first bid window, will be required to be connected to the grid as quickly as possible and by no later than December 2021. The main .
![whatsapp](/images/whatsapp.png)